1 |
7167 |
1039 |
10.10.2011 |
04.01.2013 |
C3/14252/2011 |
M/S. RUBY MANOHARAN PROPERTIES DEVELOPERS PVT LTD |
R.S.No.64/2 Vengaivasal Village at Tambaram-Velachery Main road Vengaivasal Chennai |
Vengaivasal |
Basement Floor + Stilt (part)+Ground Floor (part) + 1st floor - 15th Floor - Residential Building with 206 D.units (GF part + 1st Floor part - Departmental store and Swimming pool at 12th Floor level) |
6173.4 |
|
|
|
Basement Floor + Stilt Floor (Part) / Ground Floor (Part) + 1st Floor to 15 Floors Residential Building with 206 Dwelling Units (Ground Floor (Part) and 1st Floor (Part) for Departmental Store and 12th Floor for Swimming Pool) |
EC/S-II/20261/2015 |
EC/South-II/02/2016 dated 04-01-2016 |
|
2 |
7168 |
1175 |
17.11.2011 |
08.01.2013 |
C3/20296/2011 |
KALPATHY S. AGORAM AND OTHERS |
T.S.No.4890/5 4891 8633/2 3 4 5 6 Block no.114 T.Nagar village G.N.Chetty road Chennai-17. |
T.Nagar |
Ground Floor + 7 Floors + 8th Floor Part for Cinema theatre and office use and three Basement level and Ground level + 5 level multilevel car parking block. |
2030.94 |
|
|
|
2 Blocks (MSB Block and Fully mechanized MLCP Block). MSB block consisting Ground floor + 7 floors + 8th floor part with 4 cinema Theatres and office use and MLCP block consisting Three Basement level + Ground level + 5 level Multi level mechanized Car Parking |
EC/C-II/561/2015 |
Completion Certificate No. EC/Central-II/448/ 2015 dated 20-10-2015 |
|
3 |
7169 |
1272 |
16.12.2011 |
08.01.2013 |
C3/176/2012 |
S.ALEXANDER |
Old S.No. 409 2A1 5 17 18 415/2 11 12 T.S.No.82/2 and 86/2 Block No.139 of Velachery Village Velachery Bye pass Rod Chennai. |
Velachery |
Basement Floor + Stilt Floor (part) + Ground Floor (part) 7 Floor Residential Cum commercial building with 33 Dwelling units shop 1 & 2 at Ground Floor with triple height shop 3 at Second Floor with double hight and shop 4 at Third Floor and Gym. |
2201.76 |
|
|
|
|
|
|
|
4 |
7170 |
790 |
06.07.2012 |
18.01.2013 |
C3/10701/2012 |
NARENDAR G. JAIN (GPA) |
Door No.2 New Door No.76/31 2nd Main Road Raja Annamalipuram Chennai -28. in R.S.No.3927(as per Doc) R.S.No.3927/40 (as per Patta) Block No.86 of Mylapore Village. |
Mylapore |
Basement Floor (part) + Stilt Floor + 6 Floors Residential Building with 7 Dwelling Units |
1279.36 |
|
|
|
|
|
|
|
5 |
7171 |
556 |
25.05.2012 |
24.01.2013 |
C3/7512/2011 |
M/S. DUGAR HOUSING LTD (POA) |
S.No.779/2A 2B 2C 2D 2E & 2F of Korattur Village Ambattur - Puzhal Road Chennai. |
Korattur |
combined Basement Floor + Combined Stilt Floor + 1st Floor to 3rd Floor + Two towers with 4th Floor to 10 Floor Residential cum Commercial Building with 285 Dwelling Units Community Hall Gymnasium Swimming Pool and office |
11877.5 |
|
|
|
|
|
|
|
6 |
7172 |
727 |
21.06.2010 |
05.02.2013 |
C3/10195/2011 |
THE REGIONAL DIRECTOR Reserve Bank of India Rajaji Salai Chennai -1. |
T.S.No.5 & 7/3 Block No.14 Old S.No.207/1A1Pt 12BPt 208/1 2 3Pt 209/3Pt of Koyambedu Village Chennai. |
Koyambedu |
PP for the construction of (1) Blocks A1 to A3 B1 & B3: Stilt+6Floors (2) Block-B2: Stilt+5Floors (Combined Stilt for Blocks A1 to A3 B1 to B3) Residential Buildings with 70dwelling units (3) Care Taker Block: GF+2Floors with 4dwelling units (4) Club House: GF+FF (5) Parking Block: Stilt Floor with Open Terrace use for Basket Ball Court and Children Play area (6) Transformer Room and a Securtiy Room |
28403 |
|
|
|
|
|
|
|
7 |
7173 |
760 |
28.07.2011 |
07.02.2013 |
C3/10828/2011 |
M/S BARQUE HOTELS PVT LTD. C/O.PRESANTH S.KHARCHE No.20 Shaffee Mohamed Road Chennai -600006. |
S.No.265/1B 267/1A2A 1A2C 4 5 6 at OMR ( Rajiv Gandhi Salai) in Okkkiyamthoraipakkam Village. |
Okkiyamthoraipakkam |
PPA is for the proposed construction of BF+GF Part cum Stilt Floor Part+7Floors Hotel Building with 85 Guest Rooms. |
1759.47 |
|
|
|
|
|
|
|
8 |
7174 |
426 |
17.04.2012 |
11.02.2013 |
C3/5998/2012 |
S.VASUDEVAN & OTHER (GPA) |
R.S.No.154/186 Block No.13 of Egmore Village D.No.811 Poonamallee High Road Kilpauk Chennai. |
Egmore |
PPA is for the proposed construction of SF+6 Floors Residential Building with 12dwelling units. |
1247.49 |
|
|
|
Multi-storeyed Building comprising Stilt Floor + 6 Floors Residential Building with 12 Dwelling Units |
EC/CCW/N&C/ 4212/2013 |
EC/North/142/2014 dated 2-06-2014 |
|
9 |
7175 |
971 |
27.09.2011 |
12.02.2013 |
C3/13805/2011 |
SIDDARTH N.MAHER (GPA) Old No.25 New No.49 Barnaby Road First Floor Kilpauk Chennai -600 010. |
R.S.No.231/58 Block No.15 of Egmore Village at Old No.745 New No.448 Periyar E.V.R.Salai (Poonamallee High Road) Chennai. |
Egmore |
PPA for the Construction of Main Block : BF+Stilt+15 Floors (120 dwelling units) LIG Block: BF+Stilt+9Floors (72 dwelling units) Residential Building with 192 dwelling units. |
10694.7 |
|
|
|
|
|
|
|
10 |
7176 |
555 |
24.05.2012 |
18.02.2013 |
C3/8247/2012 |
M/S AMAR PRAKASH DEVELOPERS PVT LTD. No.24 RP Road Chrompet Chennai-44. |
S.No.255/1A2 1B 2A2 262/1A1B 2B2 3 258/2 259/2 260 261/1 506 507 510 511/1 2A1 2A2 2B1 2B2 3A 3B 512/1 2 3 of Thirumudivakkam Village Chennai. |
Thirumudivakkam |
PP for the Construction of 5th Floor to 7th Floor over the already approved SF+4Floors for Block A to J & P to R and Proposed Construction of SF+7 Floors of Block K to O - Residential Buidlings with 1437 dwelling units GF+3Floors - School Block SF+5Floors Club House. |
60828 |
|
|
|
Second Partial Completion Certificate for the construction of School Building Block consisting Ground Floor +3 Floor (One Block out of 20 Blocks) |
EC/C-I/ 6307/2014 |
Partial CC EC/North/177/2014 dt.9.9.2014,Second Partaial Completion Certificate No. EC/C-I/297/2015 dated 8-07-2015 |
|
11 |
7177 |
28 |
03.01.2009 |
19.02.2013 |
C3/22126/2008 |
M.S.RAJAMANICKKAM No.40 C.P.Ramasamy Street Alwarpet Chennai -18. |
Old S.No.332/2D 317/1A 2A 2Pt T.S.No.3 Block No.192 at Velachery Tambaram Road Velachery Village. |
Velachery |
PPA is for the proposed construction of Stilt+9Floors Residential Building with 72 dwelling units at Velachery Tambaram Road. |
2298.71 |
|
|
|
|
|
|
|
12 |
7178 |
419 |
21.04.2011 |
01.03.2013 |
C3/5803/2011 |
M/S.APOLLO HOSPITAL EDUCATIONAL TRUST NO.1 Walleys Garden Ist Street Krishnadeep Chambers Chennai -6. |
S.No.95/1 2 3 4 5 96/1A 1B 1C 98 104/2A 107 108/1 2A 109 110 111/1 2 3 4 of Ayanambakkam Village Vanagaram Road Thiruverkadu municipality. |
Ayanambakkam |
Proposed for the additional construction of Ground Floor part to 3rd Floor pt and 4th to 6th Floor over the earlier approved Ground Floor + 3 Floors Building for Hospital purpose. |
50400 |
|
|
|
|
|
|
|
13 |
7179 |
1102 |
01.11.2011 |
08.03.2013 |
C3/17246/2011 |
THE WORLD BANK No.11 Taramani Main Road Taramani Chennai -113. |
T.S.No.9pt Block No.9 of Kanagam Village T.S.No.68pt Block No.6 of Taramani Village and S.No.304pt of Kottivakkam Village Chennai. |
Kanagam Taramani Kottivakkam |
Proposed for additional construction of under Ground Diesel Tank and pump room for STP with in already approved site of World Bank. |
0 |
|
|
|
|
|
|
|
14 |
7180 |
415 |
20.04.2011 |
11.03.2013 |
C3/5666/2011 |
GURU RAGAVENDRA FOUNDATIONS PVT LTD No.50 B.B.Road Perambur Chennai -39. |
S.No.101/2A1 and 106/1 of Adayalampattu Village Vanagaram Ambattur Road Chennai. |
Adayalampattu |
Proposed for construction of Block A Basement + Ground + 2 Floors + Mezanine Floor Commercial Building with shops and two theatres Block B and C Stilt + 9 Floors Residential Building with 126 Dwelling Units |
7081.94 |
|
|
|
Partial Completion Certificate issued for Block B&C - Stilt + 9 Floors Residential building with 126 dwelling units (as per approved Block-A-BF+GF+2 floors+Mezz.floor commercial building with shops and 2 Theatres, Block B&C Stilt + 9 Floors Residential Building with 126 Dwelling Units) |
EC/CC/N-II/1465/2015 dt.30.6.2015. |
Partial C.C.No.EC/North-II/ 287 / 2015 dated 30.6.2015. |
|
15 |
7181 |
862 |
06.09.2011 |
12.03.2013 |
C3/12584/2011 |
G.ADHISESHAN No.37 TTK Road Royapettah Chennai - 14. |
S.No.363/2A 2B of Vengaivasal Village. |
Vengaivasal |
The PP is for the proposed construction of residential building 2Blocks : Block -A-Basement Floor +Stilt +12 Floors with 90 dwelling units Block-B-Stilt Floor+10Floors with 50 dwellin gunits (Totally 140 dwelling units). |
6731.89 |
|
|
|
|
|
|
|
16 |
7182 |
150 |
15.02.2011 |
14.03.2013 |
C3/2791/2011 |
SUJATHA SRINIVASAN (GPA) No.62 Casa Major Road Egmore Chennai - 600 008. |
R.S.No.1619/3 Block No.50 D.No.97 Old D.No.58 Pantheon Road Egmore Chennai - 600 008. |
Egmore |
PP for the proposed construciton of Stilt+8Floors building for office use. |
0 |
|
|
|
|
|
|
|
17 |
7183 |
cancelled |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
18 |
7184 |
415 |
12.04.2012 |
18.03.2013 |
C3/6054/2012 |
M/S. RADIANCE REALTY DEVELOPERS INDIA LTD KHIVRAJ COMPLEX 2 Door No.480 Anna Salai Nandhanam Chennai -35. |
200feet Thooraipakkam Pallavaram Road MMRD Scheme & OMR Road Chennai in S.NO. 87/1B1A 86/1B of Okkiamthooraipakkam Village. |
Okkiyamthoraipakkam |
PP for the proposed Construction of combined Basement Floor 1 & Basement Floor 2 in Tower 1 &2 Block A and B Stilt Floor + 15 Floors in Tower 1 (148 Dwelling Units) Block C and D Stilt + 12 Floor in Tower 2 (107 Dwelling Units) Tower 3 -Ground Floor + 8 Floors +9th Floor pt (85 Dwelling Units for LIG Residential Building totally to 340 Dwelling Units. |
12302.3 |
|
|
|
|
|
|
|
19 |
7185 |
801 |
09.07.2012 |
22.03.2013 |
C3/10947/2012 |
D. ELUMALAI (OWNER & POWER AGENT)PROPERITOR M/S. SRINIVAS CONSTRUCTION No.1 Thilak Street T.Nagar Chennai -17. |
S.No.31/2A1pt & 34/1 (as per Doc) S.No.31/2A1A 31/2A1B & 34/1(as per Patta) at Medavakkam- Sholinganallur Road (perumbakkam Main Road) Perumbakkam Village Chennai. |
Perumbakkam |
Revised PP is for the proposed construction of Stilt Floor + 1st Floor (Office) +2nd Floor to 8th Floor Residential Buiding with 39 Dwelling Units |
2069 |
|
|
|
|
|
|
|
20 |
7187 |
1522 |
02.12.2009 |
05.04.2013 |
C3/18442/2009 |
B.MUNIRA BEGUM & OTHERS Door No.25 27 29 & 31 Gandhi Erwin Road Egmore Chennai - 8. |
Door No.11 12 13 & 14 New Door No.25 27 29 31 Gandhi Erwin Road In R.S.No.847/2 & 4 Block No.39 Egmore Village Chennai -8. |
Egmore |
PPS is for the proposed construction of 2 Basement Floor (partly used for Mechanized parking) + Stilt Floor part (partly used for Mechanized parking) + Ground Floor part + First Floor to Third Floor + Service Floor + 4th to 9th Floor +10Floor part Hotel Building. |
2165.46 |
|
|
|
|
|
|
|
21 |
7188 |
704 |
22.07.2010 |
15.04.2013 |
C3/10819/2010 |
S.SATHYANARAYANAN No.45 Dr.Giriappa Road T.Nagar Chennai - 600 017. |
Old D.No.75 75/1 & 79 New D.No.91 & 92 Royapettah High Road and Mundakanni Amman Koil Street Chennai in R.S.No.1832/1 4 & 21 of Mylapore Village. |
Mylapore |
PP is for the proposed construction of Basement Floor Part+Stilt Floor Part+Ground Floor Part+1st to 11Floors Residential Building with 33 dwelling units. |
1831.5 |
|
|
|
Multi-storeyed Building comprising Basement Floor (Part) + Stilt Floor (Part) / Ground Floor (Part) + 1st Floor to 11 Floors Residential Building with 33 Dwelling Units |
EC/S-I/1298/2015 |
EC/South-I/370/2015 dated 20-08-2015 |
|
22 |
7189 |
905 |
14.09.2011 |
29.04.2013 |
C2/13029/2011 |
M/S.ADHESIVES AND CHEMICALS No.6 Arcot Road Porur Chennai-600 116. |
S.Nos.129/3A1 130/1 131/1B1A 132/1 133 and 134/1A of Porur Village Arcot Road Chennai. |
Porur |
PP for the proposed construction of (1) Commercial Block : Double Basement Floor + Ground Floor + 8 Floors for Retail Shops and Office purpose and (2) Residential Block : Double Basement Floor + Stilt Floor + 11 Floors with 128 Dwelling Units Gymnesium Club House Home theatre Toddlers play area and Swimming Pool at First Floor level. |
9930 |
|
|
|
|
|
|
|
23 |
7190 |
318 |
01.04.2010 |
5/3/2013 |
C3/17509/2011 |
THE CHIEF ENGINEER TAMILNADU SLUM CLEARANCE BOARD No.5 Kamarajar Salai Chennai -5. |
Nukkampalayam Road Perumbakkam Chennai in S.No. 523 524/1 2 527 528 539/2 540/1 541 542 543 544 & 546 of Perumbakkam Village. |
Perumbakkam |
Proposed construction of Residential building in Ground Floor + 7 Floors 40 Blocks with 7440 dwelling units (Type -7 to 19 19 Blocks - 3534 Dwelling Units (Type 9 - 21 Blocks-3906 dwelling Units. |
22072 |
|
|
|
|
|
|
|
24 |
7191 |
185 |
22.02.2011 |
5/6/2013 |
C3/3039/2011 |
KISHORE KUMAR GOKUL DAS Managing Director KG Foundations(p) Ltd Ground Floor No.5 Bishop Valles Avenue (East) Mylapore Chennai - 600004. |
S.Nos.4/1A1 1A2 2A 5/1A 1B 1C 2A 2B 2C 6/1A 1B 1C 1D 1E1 1E2 1E3 1E4 1E5 2 7/1A2A 1A2B 1A2C1 1A2C2 2A2 13/1A 1B 1C 1D 1E 2A1 2A2 2A3 2A4 2A5 2A6 14/1A 1B 1C 1D 15/1A 1B 1C 1D 1E 73/1B and 73/1C of Adayalampattu Village Villivakkam P.U Chennai. |
Adayalampattu |
PP for the proposed construction of Block A and B Stilt + 13 Floors Block C and D Stilt + 16 Floors Block E Basement Floor + Stilt + 15 Floors Block F and G combined Basement Floor + Stilt + 14 Floors Residential Building with 1460 Dwelling Units and a club house Ground Floor + FF + Second Floor (part) as an addition and alteration to the earlier approved blocks 1 and 2 Stilt + 13 Floors Block 3 and 4 Stilt + 16 Floors Block 5 - Stilt + 14 Floors Residential Building with 992 Dwelling Units and a club House Ground Floor + 1st Floor + 2nd Floor part. |
47650 |
|
|
|
|
|
|
|
25 |
7192 |
cancelled |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
26 |
7193 |
852 |
19.07.2012 |
5/27/2013 |
C3/11328/2012 |
M/S.OCEAN INTERIORS LTD & 6 OTHERS No.17/35 2nd Main Road Gandhi Nagar Adyar Chennai -20. |
Dr. Kalaingar Karunanidhi Salai (OMR-ECR Link Road) in S.No.278/1 278/2 280/1A1A 280/1A1B 280/1A1C 280/1A2 280/1B1 280/1B2 281/1A1A2 281/1A1A1 of Sholinganallur Village. |
Sholinganallur |
PP is for the proposed Construction of Single Block - Basement Floor + Ground Floor (part)/ Stilt (part) + 15 Floors Residential developments with 300 Dwelling Units and Departmental Store at Ground Floor and Office at First Floor and Second Floor level Swimming pool at 1st Floor level. |
8097.18 |
|
|
|
|
|
|
|
27 |
7194 |
942 |
20.09.2011 |
5/30/2013 |
C3/13547/2011 |
P.BHAVANI No.802 & 804 Anna Salai Nandanam Chennai -35. |
Thirumudivakkam Road in S.No.360/B 363/1 364 365/1A 366/1A 1B 2A 4 380/1 391/1 392/1A 393 394/2A 396 397/1 2A1 of Thirumudivakkam Village |
Thirumudivakkam |
PP is for the proposed construction of Group Development - 11 Blocks - Residential developments with 634 Dwelling Units and Commercial (Bank Departmental Store and Shop) Development and swimming Pool at club House Block Block 1 to 7 - Stilt Floor + 7 Floors Residential developments Block - 8 - Stilt + 7 Floors Residential developments (LIG Housing ) Block - 9 - Stilt Floor + 1 st Floor (Bank Departmental Store) + 2nd and 3rd Floor (Shop) Block - 10 - Ground Floor + 3 Floors ( Gym Association Room Games Room Guest Room) Block _11 Ground Floor + 1st Floor Residential developments with 4 dwelling Units |
44871.1 |
|
|
|
Stilt Floor +4 Floors Office use Building |
EC/C-I/8669/2015 |
Partial Completion Certificate No. EC/Central-I/364/ 2015 dated 19-8-2015 |
|
28 |
7195 |
734 |
19.07.2011 |
5/31/2013 |
C3/10197/2011 |
THE REGISTRAR (I/C) UNIVERSITY OF MADRAS Central building Chepauk Chennai -5. |
T.S.No.2pt Block No.6 of Kottur Village |
Kottur |
PP is for the proposed construction of University building Ground Floor + 7 Floors Classroom with Lab and Stilt + 3 Floors Nano Techonology Building. |
11839.6 |
|
|
|
|
|
|
|
29 |
7196 |
191 |
15.02.2012 |
6/3/2013 |
C3/3120/2012 |
M/S.PRIME SRISTI HOUSING PVT LTD NO.B2 Vijay Veena Apartments Balaji Nagar Radhakrishnan Salai Valasaravakkam Chennai -87. |
S.No.17/7A 7B 7C 8B3 & 8B4B of Moulivakkam Village Kundrathur High Road Chennai. |
Moulivakkam |
PP is for the proposed construction of combined Basement Floor for Block A and B Block A - Stilt + 11 Floor (44 Dwelling units) Block B - Ground Floor part/ Stilt Part+11 Floors (42Dwelling Units) totally 86 Dwelling units for Residential Developments. |
3986.17 |
|
|
|
|
|
|
|
30 |
7197 |
1246 |
09.12.2011 |
6/10/2013 |
C3/21260/2011 |
ASHISH GUPTA A.G.HOSPITALITIES PVT LTD No.26 & 27 Morison Ist Street Alandur Chennai -16. |
R.S.No.3881/3 Block No.76 of Mylapore Village at Door No.11 Chamiers Road Chennai. |
Mylapore |
PP is for the proposed construction of Double Basement Floor + Ground Floor + 1st Floor + Service Floor + 2nd to 7th Floor Hotel Building. |
2056 |
|
|
|
|
|
|
|
31 |
7198 |
470 |
27.04.2012 |
6/20/2013 |
C3/7885/2012 |
M/S.RASHA MACHINERY (P) LTD No.10/12 Purasawalkkam High Road Chennai-7. |
GST Road Chrompet Chennai in Old S.No.479/1Apt and 479/1Bpt of Zamin Pallavaram Village T.S.No.1/1 2/1 Block No.43 Ward E of Pallavaram Municipality. |
Zamin Pallavaram |
PPA is for the proposed construction of 2nd Basement Floor part for Block -2(used for parking) + combined 1st Basement floor for Block 1 and 2(used for parking) + Block 1 - Ground Floor + 8 Floors for show room use and Block 2 multi level parking (6 level above stilt floor ) Mechanized parking) wih height of 14.59m. |
4085.84 |
|
|
|
Multistoreyed Building comprising 2nd Basement Floor (Part) for Block 2 (used for Parking) + Combined 1st Basement Floor for Block 1&2 (used for Parking) + Block 1 – Ground Floor + 8 Floors for Show Room use and Block-2 Multilevel Parking (5 levels) [As per approval 6 Levels] above Stilt Floor (Mechanized Parking) with Height of 15.25 m. |
EC/CCW/S/ 11335/2014 |
EC/South/194/ 2014 dated 30-10-2014 |
|
32 |
7199 |
941 |
20.09.2011 |
7/9/2013 |
C3/13595/2011 |
S. XAVIER BRITTO AND VIMALA RANI BRITTO No.1 Royal Enclave Besant Avenue Road Adyar Chennai -20. |
Old S.No.638/1 2 3 639/1 2 3 644/1 T.S.No.1/10 Block No.176 Velachery Village IRR Southern Segment Velachery Chennai. |
Velachery |
PP for the proposed construction of combined Triple Basement Floor for both Block A and B and Block A- GF+ 7 Floors + 8th Floor part with MALL/Show roos/Theatres - 8 Nos Restobar Food court / 28 Guest rooms commercial building and Block B Stilt pt/Ground Floor pt + 12 Floors + 13th Floor part Residential Building with 91 Dwelling units Gymnasium and Swimming pool in Ground Floor |
8428.71 |
|
|
|
|
|
|
|
33 |
7200 |
849 |
02.09.2011 |
6/26/2013 |
C3/12498/2011 |
M/S.NAVIN HOUSING PROPERTIES PVT LTD REP BY ITS EXECUTIVE DIRECTOR P.BHAVANI(GPA) No.802 & 804 Anna Salai Nandanam Chennai -35. |
S.No.364/1B2 365/1B1 19/6A1 6A2 6A3 6C1 6B2 20/2B 3 4A 4B 4C 5A1 5A2 5B1 5B2 37/6A 6B 7 8 and 9 of Vengaivasal Village Chennai. |
Vengaivasal |
PP is for the proposed construction of Group Development - 11 Blocks - Residential developments with 958 Dwelling Units and Commercial Developments and Swimming Pool at 4th Floor of Club House Block Combined Basement Floor for Block B1 B2 and Commercial Block and Block A1 to A6 and Club House Block Combined Stilt Floor for Block B1 B2 and Commercial Block Block A2 and A3 Block A1 (A4 to A6) and Club House Block Block A1 to A6 - combined Basement Floor + Stilt Floor + 13 Floor + 14th Floor part (Block A6 for LIG Housing) Block B1 and B2 - Combined Basement Floor + Stilt Floor + 12 Floor +13 and 14 Floor part Commercial Block - combined basement floor + Ground Floor + 2 Floor (Bank Departmental Store Shop and Restaurant) club House - combined basement floor + Stilt +3d Floor +4th Floor part (Swimming pool at 4th Floor) Commercial block - Ground Floor + 1st Floor Office and Showroom. Development and swimming Pool at club House Block Block 1 to 7 - Stilt Floor + |
39860.8 |
|
|
|
Completed 11 Blocks Residential Developments with 958 Dwelling Units,Two Commercial Blocks i.e. one Block comprising Combined Basement Floor + Ground Floor + 2 Floors (Bank, Departmental Store, Shop and Restaurant) and another Block comprising Ground Floor + 1st Floor Office and Show Room [As per approval Group Development of 11 Blocks – Residential Development with 958 Dwelling Units & Commercial Development and Swimming Pool at 4th Floor of Club House Block; Combined Basement Floor for Block-B1, B2 & Commercial Block and Block-A1 to A6 & Club House Block; Combined Stilt Floor for Block-B1, B2 & Commercial Block and Block-A2 & A3 and BlockA1 (A4 to A6 & Club House Block); Block-A1 to A6 – Combined Basement Floor + Stilt Floor + 13 Floors + 14th Floor (Part) [Block A6 for LIG Housing]; Block-B1 & B2 – Combined Basement Floor + Stilt Floor + 12 Floors + 13th & 14th Floor (Part); Commercial Block – Combined Basement Floor + Ground Floor + 2 Floors (Bank, Departmental Store, Shop and Restaurant); Club Block – Combined Basement Floor + Stilt Floor + 3 Floors + 4th Floor (Part) [Swimming Pool at 4th Floor], Commercial Block – Ground Floor + 1st Floor Office and Show Room] |
EC/S-II/6017/2015, EC/S-II/13336/2015 |
Partial CC No.EC/South-II/278/2015 dt.19.6.2015 for Block No.B1 & B2,Second Partial C.C.No.EC/South-II/482/2015 dated 12.11.2015 for 2 Commercial Blocks. |
|
34 |
8101 |
973 |
27.09.2011 |
6/27/2013 |
C3/13806/2011 |
M/S.SIDHARTH FOUNDATION & HOUSING LTD REPBY ITS DIRECTOR PRAVIN M.JAIN No.14 G.N.Chetty Road T.Nagar Chennai -17. |
S.No.61/2 65/2B9 3A1A 3A1B 3A1C 3A2A 3A2B 3B & 3C of Madhanandapuram Village Chennai. |
Madanandpuram |
PP is for the proposed construction of 2 Blocks - Basement Floor + Stilt Floor + 10 Floors Residential Building with 388 dwelling units (Block 1 - Basement Floor + Stilt + 10 Floors Residential with 108 Dwelling units. Block 2 - Basement Floor + Stilt + 10 Floors Residential Building with 280 Dwelling units)containing LIG unit annexed (89 Dwelling Units) |
12095.7 |
|
|
|
|
|
|
|
35 |
8102 |
1032 |
06.9.2012 |
7/2/2013 |
C3/14142/2012 |
VIJAY KUMAR LODHA & 2 OTHERS No.10 2nd Cross Street Raja Annamalaipuram Chennai -28. |
Velachery - Tambaram Road in S.No.321/3 4 5 6 322/2 325/1A of Pallikaranai Village |
Pallikaranai |
PP for the proposed construction of 3 Blocks - Residential cum Office use with Swimming Pool in Block -2 4th Floor level (Totally 140 Dwelling Units) Block - 1(MSB) Stilt + 12 Floors (Residential with 132 Dwelling Units) Block - 2 (SB)Stilt + 4 Floors (Residential with 8 Dwelling units) and Block - 3 Stilt + 2 Floors (office use) |
7162.88 |
|
|
|
|
|
|
|
36 |
8103 |
1039 |
26.10.2010 |
7/5/2013 |
C3/15942/2011 |
PRAVEEN JAIN No.156 Poonamallee High Road Kilpauk Chennai - 10. |
S.No.166/1A 1B 2 3A 3B 4A 4B 5A 5B 15A1 of Karapakkam Village Rajiv Gandhi Salai (OMR} Chennai. |
Karapakkam |
PP for the proposed construction of common Basement Floor in Block A to E Ground part Club House Block A and E Stilt + 19 Floor 2 Blocks 474 Dwelling Units Block B - Stilt + 19 Floors 258 Dwelling Units Block C - Stilt + 19 Floors 129 Dwelling Units Block D - Stilt + 19 Floors 129 Dwelling Units Block F - Stilt + 18 Floors 108 Dwelling Units Block G Stilt part/Ground Floor part + 13 Floors 130 Dwelling Units Club House - Ground Floor + 2 Floors Total No of Dwelling Units 1228. |
46186.1 |
|
|
|
|
|
|
|
37 |
8104 |
847 |
7/19/2010 |
7/9/2013 |
C3/11536/2012 |
M/S. AISHWARYA PROPERTIES PVT LTD REP BY THIRU. S.SRIDHAR DIRECTOR NEWRY SHREYA F - 34. Old No.97 F Block 4th Street Anna Nagar East Chennai 102. |
Plot No.2 Old S.Nos. 657/2Apt 659/1pt 659/2pt 659/3pt 659/4pt 660/2Apt and 660/2Bpt T.S.No.21/14 22/2 23/7 Block No.77 Ward I Paruthipattu Village Poonamallee Taluk Avadi Municipality. |
Paruthipattu |
PP for the proposed construction of combined stilt (Parking] at Ground Floor and First Floor level with two towers each 2nd Floor to 9th Floor Residential Building with 108 Dwelling Units. |
4304.77 |
|
|
|
Combined Stilt (Parking) at Ground Floor and First Floor level with two Towers each 2nd Floor to 9th Floor Residential building with 108 dwelling units |
EC/CC/N-II/17254 /2015 |
C.C.No.EC/North-II/ / 12 / 2016 dated 13.1.2016 |
|
38 |
8105 |
62 |
1/21/2013 |
7/8/2013 |
C3/1441/2013 |
G.SRINIVASUN AND OTHERS No.19/1 3rd Cross Street R.A.puram Chennai -28. |
S.No.399/1B 399/2 and 400/5 of Sholinganallur Village Chennai abutting 24m wide TNHB Road |
Sholinganallur |
PP is for the proposed construction of Stilt Floor + 8 Floors +9th Floor part Residential development with 42 Dwelling Units (Gym at First Floor} |
2168.21 |
|
|
|
|
|
|
|
39 |
8106 |
1261 |
11/8/2012 |
7/10/2013 |
C3/18016/2012 |
C.CHITTIBABU No.33 Paper Mills Road Perambur Chennai -11. |
S.No.1414/3 5A T.S.No. 72/2 3 Block No.46 Ward D of Madhavaram Village Inner Ring Road Chennai. |
Madhavaram |
PP for the proposed consturction of combined Basement Floor with Block A-Stilt + 9 Floors for Showroom Office and 15 Dwelling Units Block B-Stilt + 9 Floors Residential Builidng with 54 Dwelling Units (Totally 69 Dwelling Units) |
2692.26 |
|
|
|
|
|
|
|
40 |
8107 |
190 |
2/15/2012 |
7/19/2013 |
C3/3337/2012 |
K.S.GOPALAN GPA FOR M/S. MILLMORE ENGINEERING PVT LTD Flat C Adhavan Maligai New No.9 Old No.29 Sadullah Street T.Nagar Chennai -17. |
Door N0.189 OMR(Rajiv Gandhi Salai) in S.No.494/1A2(as per Doc) S.No.494/1A2A(as per Patta) of Sholinganallur Village Chennai. |
Sholinganallur |
PP for the proposed constr uction of 4 Blocks - Combined Double Basement Floor connecting 4 Blocks Block 1 & 2 - Stilt + 11 Floors (Residential Development with 108 Dwelling Units in Each Block) Combined Stilt Floor for Block 3 & 4 Block 3 (LIG Block) Stilt + 10 Floors + 11th Floor part (Residential Development with 71 Dwelling Units)Block 4 - Ground Floor + 13 Floors( Ground Floor + First Floor) for Incidental use and Second to Thirteenth Floor Residential Developments with 36 Dwelling Units of Residential Developments with 323 Dwelling Units with Swimming pool Block 3 - at First Floor level |
14700 |
|
|
|
|
|
|
|
41 |
8108 |
1281 |
11/19/2012 |
7/18/2013 |
C3/18375/2012 |
M/S. DUET INDIA HOTELS(CHENNAI OMR)PVT LTD REP BY ARUN C.KALLEKKAD CF2 LILAC Apartments Ramakrishna Avenue Rajarajeswari Nagar Rajakilpakkam Chennai. |
OMR(Rajiv Gandhi Salai) in S.No.169/1B1A 6B of Semmancheri Village Chennai. |
Semmancheri |
PP is for the proposed construction of 2nd Basement Floor + 1st Basement Floor (part of Floor has been used for Mechanized parking ) + Ground Floor/Stilt Floor(part of Floor has been used for Mechanized parking) + First Floor + Service Floor + 2nd Floor to 9th Floor - Hotel building with 142 Guest Rooms. |
1735.98 |
|
|
|
2nd Basement Floor + 1st Basement Floor (pt used for Mechanized parking) + Ground Floor + Stilt (part used for Mechanized parking) +1st Floor + Service floor + 2nd floor to 9th floor, Hotel building with 142 Guest rooms. |
Letter No. EC/S-I/ 17850/2015 |
EC/South-I/ 531/2015 dated 28-12-2015 |
|
42 |
8109 |
231 |
3/10/2010 |
8/7/2013 |
C3/4122/2010 |
M/S.V.S.T.MOTORS LTD Old Door No.182 New Door No.237 Anna Salai Chennai-6. |
R.S.No.323/5 Block No.11 of Triplicane Villge. |
Triplicane |
PP for the construction of Double Basement + Stilt Floor + 7 Floors Commercial Building for Shop cum Office purpose. |
4123.7 |
|
|
|
|
|
|
|
43 |
8110 |
1294 |
12/22/2011 |
8/7/2013 |
C3/737/2012 |
P.BHAVANI No.802 & 804 Anna Salai Nandanam Chennai -35. |
Old S.No.1088/2B & 1088/3 T.S.No.14 & 15 Block No.62 Ward No.C of Madhavaram Village Old D.No.443/1 444 New D.No.70 Madhavaram - Red Hills Road Chennai. |
Madhavaram |
PP for the proposed construction of Stilt Floor+12 Floors Residential Building with 224 dwelling units with Swimming Pool at First Floor Gym at 9th Floor. |
9769 |
|
|
|
|
|
|
|
44 |
8111 |
441 |
4/23/2012 |
8/19/2013 |
C3/6978/2012 |
M/S.MEDICAL RESEARCH FOUNDATION 18/41 College Road Nungambakkam Chennai-6. |
R.S.No.87/13 Block No.15 of Nungambakkam Village Pycrofts Road Chennai. |
Nungmabakkam |
PP additional construction and proposed additions and alterations in existing basement Ground Floor and First Floor of the earlier approved basement + Ground Floor + 5 Floors Hospital building and proposed additional construction of basement + Stilt part +Ground Floor part + 6 Floors Hospital building |
4448.16 |
|
|
|
|
|
|
|
45 |
8112 |
17 |
1/4/2013 |
8/19/2013 |
C3/631/2013 |
M/S.PREMIER INN INDIA PVT LTD REP BY ITS DIRECTOR SHASHI BHUSHAN SINGH No.28 Barakomba Road 11th Floor Dr. Gopal Das bhavan New Delhi -110001. |
New S.No.169/1A1A2 5 and 6A Old S.No.169/1A of Semmanchery Village Chennai. |
Semmancheri |
PP is for the proposed construction of Basement Floor + Stilt Floor part/Ground Floor part + Ist Floor(Restaurant) + 2nd to 9th Floor Hotel use with 58 Guest rooms at OMR(Rajiv Gandhi Salai) |
1570.7 |
|
|
|
|
|
|
|
46 |
8113 |
776 |
8/11/2010 |
8/20/2013 |
C3/11889/2010 |
M/S. ETA PROPERTIES AND INVESTMENTS PVT LTD CHENNAI CITY CENTRE 4TH Floor. No.10 and 11 Dr. Radhakrishnan Salai Mylapore Chennai-4. |
Door No.99 in Greenways Road Door No.131 R.K.Mutt Road Chennai in R.S.No.4267/2 to 8 Block No.92 of Mylapore Village. |
Mylapore |
Planning permission application is for the proposed construction of Basement Floor + Ground Floor part/ Stilt part + FF to 13 Floors Residential Building with 48 Dwelling Units with swimming pool in the Ground Floor |
3643.3 |
|
|
|
|
|
|
|
47 |
8114 |
805 |
8/20/2010 |
8/21/2013 |
C3/12423/2010 |
M/S.FAERY ESTATES PVT LTD No.40 MGR Salai (Anna Neduchansalai) Rajiv Gandhi Salai(OMR) Kandanchavadi Perungudi Chennai-96. |
S.No.36/17A 227/1A 1B 2A1 2A2 228/1A1C of Perungudi Village Door No.40 Veeranam Salai Chennai. |
Perungudi |
Revised PP is for the proposed construction of combined of triple basement Floor + Ground Floor + Mezanine Floor + 13 Floors (3 Towers)in a single Block. |
50077.3 |
|
|
|
Combined Triple Basement Floor + Ground Floor + Mezzanine Floor + 13 Floors (3 Towers) in a Single Block |
EC/S-II/19932/2015 |
EC/South-II/01/2016 dated 04-01-2016 |
|
48 |
8115 |
835 |
7/16/2012 |
8/22/2013 |
C3/11382/2012 |
M/S. HCL TECHONOLOGIES LTD No.138 S.No.602/3 Elcot Sholinganallur- Medavakkam High Road Sholinganallur Chennai. |
Plot No.8 Sholingan allur- Medavakkam High Road Industrial Township in S.No.602/3pt of Sholinganallur Village Chennai. |
Sholinganallur |
Revised PP for the proposed additional construction of Block 7(afeteria) -Ground Floor+ 3 Floors: Block 8(Software Development Block 4) Ground Floor + 5 Floors + 6th Floor part Block -9(Software Development ) Block-5 ) Ground Floor + 5 Floors + 6th Floor part Block 10(Software development Block 6) Ground Floor + 5 Floors +6th Floor part Block 11-(Software Development Block -7)Ground Floor + 5 Floors +6th Floor part Block 12(Sub station) Ground Floor + 1St Floor +rooms at terrace Block 13 MLCP- Ground Floor + 8 Floors Block 14(Security ) Ground Floor Block 15(Travel Desk) Ground Floor Block 16(Security cabin2) Ground Floor over the existing development of Block -1(software development Block-1) (Software development Block-1) existing GF +5F + rooms at terrace Floor: Block -2(Software development Block 2) Existing GF + 5F +rooms at terrace Block -3(software development Block 3) existing Ground Floor + 5 Floors room at terrace Block -4 (Sub station) existing GF Block 5 (Security cabin) existing Ground Floor Block 6 RMG/VCB(existing) GF. |
182107 |
|
|
|
|
|
|
|
49 |
8116 |
21 |
1/7/2013 |
8/22/2013 |
C3/719/2013 |
M/S.OZONE PROJECTS PVT LTD No.63 G.N.Chetty Road T.Nagar Chennai-17. |
T.S.Nos.1/1 1/2 2/3 2/4 4/2 of Block No.26 T.S.No.3/2 3/3 4/3 7/2 of Block No.27 of Koyambedu Village Jawarhalal Nehru Road Chennai. |
Koyambedu |
PP for the revised proposal for the construction of combined 3rd Basement Floor part + Combined Double basement Floors + Block Nos. 9 16 23 24(Type A) Ground Floor + 16 Floors with 260 Dwelling units + Block Nos.2 7 11 13 14 17 22 25 and 26(Type B) Ground Floor + 16 Floors with 576 Dwelling units Block Nos.1 3 4 5 6 8 10 12 15 18 19 20 21(Type C) Ground Floor + 16 Floors with 845 Dwelling units + Block No.27 Ground Floor + 16 Floors with 136 Dwelling Units Block No.28 29 30(LIG Housing) Ground Floor + 20 Floors with 532 Dwelling units(Totally 2349 Dwelling units) Club House :Ground Floor + 2 Floors swimming pools jaccuzi kids pool and commercial Block Triple Basemnet Floor + Lower Ground Floor + 3Floors +4th Floor part with Anchor shops Food court + 10 Cinema theatres. |
164045 |
|
|
|
Group development MSB Residential block Nos.13, 14, 15, 19, 23, 24, and 25 ( 7 Blocks) comprising with combined Double Basement Floor + Ground Floor + 16 Floors totally 452 dwelling units and one Club House comprising Ground floor + 2 Floors |
EC/CC/North-I /17666/2015 dated 28.1.2016 |
EC/North-I /21 /2016 dated:28-1-2016 |
|
50 |
8117 |
96 |
1/24/2012 |
9/2/2013 |
C3/1686/2012 |
M/S.KRITICONS LTD REP BY ITS M.D.THIRU.D.K.JAIN No.3 4th Floor Ceebros Centre No.45 Monteith Road Egmore Chennai -8. |
R.S.No.1759/1 Block No.27 of Purasawalkkam Village Door No.138 Perambur Baracks Road Chennai -7. |
Purasawalkkam |
PP for the construction of Stilt + 7 Floors Residential Building with 42 Dwelling Units and Stilt + 2 Floors for GYM and Car parking. |
2436.84 |
|
|
|
|
|
|
|
51 |
8118 |
513 |
5/10/2012 |
9/3/2013 |
C3/8077/2012 |
M/S.CITADINES OMR APART HOTEL PVT LTD No.284/1B Devs Ark 2nd Floor OMR Kottivakkam Chennai -95. |
OMR(Rajiv Gandhi Salai) in S.No.494/1A1C1A of Sholinganallur Village Chennai. |
Sholinganallur |
PP for the proposed construction of Basement Floor + Ground Floor + 1st to 7th Floor + Service Floor + 8th Floor part Hotel Building with 269 Guest room and GYM office and Swimming pool at 8th Floor level. |
|
|
|
|
|
|
|
|
52 |
8119 |
225 |
3/4/2013 |
9/10/2013 |
C3/2286/2013 |
D.DESIKACHARALU Door No.155 Old No.70 G.N.Chetty Road T.Nagar Chennai - 17. |
T.S.No.5375/2 Block No.122 at G.N.Chetty Road T.Nagar Chennai -17. |
T.Nagar |
PPA is for the Renewal of Planning Permission for the proposed construction of Basement Floor + Stilt Floor + 8 Floors office Building with 9 Guest rooms. |
|
|
|
|
|
|
|
|
53 |
8120 |
1179 |
10/18/2012 |
9/18/2013 |
C3/16942/2012 |
M/S.JAIN HOUSING AND CONSTRUCTION LTD. REP BY SANDEEP METHA No.11 Somasundaram Street T.Nagar Chennai-17. |
S.No.36/16B2 of Perungudi Village Anna Neduchalai Chennai. |
T.Nagar |
PP for the proposed construction of Basement Floor + Stilt Floor + First Floor and Second Floor for parking + 3rd Floor to 19th Floor Residential Building (804 Dwelling Units) |
20234.1 |
|
|
|
|
|
|
|
54 |
8121 |
962 |
8/17/2012 |
9/24/2013 |
C3/13278/2012 |
M/S. BHARATH PROMOTERS No.30 Old No.25/1 Krishnappa Chetty Street Chindadripet Chennai - 02. |
S.No.355/1A 1B 356/1A 1B 2A 2B1 2B2 357/1A2 412/1 2 of Kovur Village gaining access through 12m wide road from Kundrathur Main Road Chennai. |
Kovur |
PP for the proposed construction of 7Block-Residential Development with 609 dwelling units Departmental Store Gym & Swimming Pool Block-A-Stilt Floor+7Floors with 56 dwelling units Block B & C-Stilt+7Floors with 154 dwelling units in each block Block-D-GF(Pt)/Stilt(pt)+7Floors with 140 dwelling units and Departmental Store (GF only) Block-E(LIG Housing) Stilt+7Floors with 105 dwelling units Block-F-Basement Floor+Ground Floor+1st Club House Block-G-Ground Floor only Swimming Pool and dress change room. |
35126.4 |
|
|
|
|
|
|
|
55 |
8122 |
1341 |
12/4/2012 |
10/4/2013 |
C3/19139/2012 |
M/S.AMAR PRAKASH DEVELOPERS PVT LTD No.42, R.P.Road, Chrompet, Chennai-44. |
S.No.616/1, 707/1A, 707/1B, 707/3, 708/3, 709, 710/1, 721/1, 721/2, 726/1, 726/2, 727/1A, 727/1B, 727/2, 728/1, 728/2, 729/1, 729/3, 730, 734 of Kundrathur Village, Chennai. |
Kundrathur |
Revised Planning permission for the proposed construction of Group development - 16 Blocks, Residential development with 2300 Dwelling units, Departmental Store, Clinic, Restaurant, Club House and Open Swimming Pool at Fourth Floor level in Club House Block 1 & 2, Block A - Ground Floor part/Stilt Part + 6 Floors + 7th Floor part with 74 Dwelling Units and Departmental Store and Clinic at Ground Floor, Block - B to Block J - Stilt Floor + 6 Floors + 7th Floor part with 1358 Dwelling units, Block K(partly reserved for LIG Housing ) Block L(LIG housing) and Block ST (LIG Housing) - Stilt Floor + 7 FLoors with 518 Dwelling Units, Block M- Stilt Floor + 7 Floors with 350 Dwelling Units, Club House Block 1 & 2 Stilt + 3 Floor + 4th Floor part - Gym, Restaurant, Multi purpose Hall, Indoor games, SPA & Open Swimming pool at Fourth Floor level. |
74750 |
|
|
|
|
|
|
|
56 |
8123 |
1188 |
10/19/2012 |
10/7/2013 |
C3/3644/2011 |
M/S. PURUVANKARA PROJECTS LTD No.7, Seshadri Road, LVR Centre, Alwarpet, Chennai - 18. |
Door No.148, Old Mahabalipuram Road, (Rajiv Gandhi Road) S.No.355/3A, 355/4A1, 355/4B, 355/4C, 355/4D1, 351B/3 & 352/B/3 of Okkiyamthooraipakkam Village. Chennai. |
Okkiyamthoraipakkam |
PPA is for the Renewal of Planning Permission for the proposed construction of Double Basement + Stilt Floor/ Ground Floor + 13 Floors. |
0 |
|
|
|
Planning Permission No.C/PP/MSB-IT/56AtoN/2013, Planning Permit No.8123 in letter No.C3/3644/2011 dated 17.10.2013 |
Multi-storeyed Building comprising Double Basement Floor + Stilt Floor (Part) / Ground Floor (Part) + 13 Floors for I.T.Park. |
EC/S-I/8867/2015 |
|
57 |
8124 |
477 |
5/7/2013 |
10/9/2013 |
C3/6165/2013 |
VIMALA DEVI No.2, Sarangapani Street, T.Nagar, Chennai - 17. |
Rajiv Gandhi Salai(OMR) in S.No.339/1, 339/2A, 339/2B, 340A/1A1, 340A/1B1, 340A/2A1A, 340/2A2A & 340A/2B1A of Okkiyamthooraipakkam Village, Chennai. |
Okkiyamthoraipakkam |
Renewal of Planning Permission for the proposed construction of Basement Floor + Ground Floor + 9 Floors + 10th Floor part Office Building. |
0 |
|
|
|
|
|
|
|
58 |
8125 |
1206 |
10/26/2012 |
10/10/2013 |
C3/17510/2012 |
M/S. PRINCE FOUNDATION LTD REP BY DIRECTOR ITS THIRU. RAJKUMAR A KAMDAR No.61, Ormes Road, Kilpauk, Chennai -10. |
S.Nos.135/3, 4, 136/2B, 137, 139/2, 140/1, 2A, 2B, 3, 141/1,2,3, 142, 143/1,2, 148/2, & 149 of Iyyappanthangal Village, Mount Poonamallee High Road, Chennai. |
Iyyappanthangal |
PP for the proposed Construction of combined Basement for all Blocks with Block 1 to 6(Block 4 for LIG) with Stilt + 9 Floors - 576 Dwelling Units and Club House with Ground Floor + 2 Floors to the earlier approval obtained for construction of common Basement Floor + Stilt + 10 Floors - 7 Blocks with 626 Dwelling Untis and Club House. |
22358 |
|
|
|
|
|
|
|
59 |
8126 |
622 |
6/7/2012 |
10/25/2013 |
C3/9193/2012 |
N.R. DANAPALAN & VIOLET DANAPALAN No.32, Ramasamy Street, Devi karumariamman Nagar, Valasaravakkam, Chennai - 87. |
Plot No.48pt, 69 & 70pt, Old Door No.8 & 70, New Door No.27, GST Road, of Zamin Pallavaram Village. Old S.No.508/66, 64pt, T.S.No.73, Ward E, Block No.21. |
Zamin Pallavaram |
PPA for proposed construction of Basement Floor + Ground Floor part /Stilt Floor part + 9 Floors Hotel Building. |
1516.62 |
|
|
|
|
|
|
|
60 |
8128 |
|
|
11/19/2013 |
C3/13722/2013 |
M/S.EMPEE INTERNATIONAL HOTELS & RESORTS LTD REP BY MS.NISHA No.693, Anna Salai, Chennai-6. |
Door No.696, Anna Salai, Chennai-6. of Nungambakkam Village. S.Nos.35/35, 35/41, 35/42, 35/43, 35/46, 35/47, 35/51, 35/77, 95,96,98 Block No.6 |
Nungmabakkam |
Renewal of Planning Permission for the proposed construction of Double Basement Floor + Ground Floor + 8 Floors Hotel Building. |
|
|
|
|
|
|
|
|
61 |
8129 |
1248 |
12/12/2011 |
11/28/2013 |
C3/3875/2013 |
M/S.POOMPUHAR REAL ESTATE PVT LTD. Poes Garden , No.13, Raga Veera Avenue, Channi-86. |
Door No.106 to 109, Dr. Muthulakshmi Salai, Adyar in Old No.1/5pt, 15/2pt, 15/3pt, 15/13, T.S.No.19,20, 21/1, 21/2, 21/3, 22, 23 Block No.16 of Pallikaranai Village, Chennai. |
Pallikaranai |
Planning permission for the proposed construction of Basement Floor(Mezanine parking) Stilt Floor(Mezanine Parking) + 14 Floors+ 15th Floor part (Gym and Association room) Residential Building with 56 Dwelling Units. |
2792.25 |
|
|
|
|
|
|
|
62 |
8130 |
858 |
9/6/2011 |
12/2/2013 |
C3/12500/2011 |
M/S.ADINATH FOUNDATION PVT LTD REP BY ITS DIRECTOR THIRU.GIRESH BHANDARI F2, First Floor New No.31, Rajamannar Street, T.Nagar, Chennai-17. |
Old S.No.1205/2, 1206/2, 1206/1A2, T.S.No.33/2, of Block NO.55, Ward No.D, of Madhavaram Village, GNT Road, Chennai. |
Madhavaram |
Planning permission for the proposed construction of 3 Blocks combined Basement Floor for Block 1 and 2 with Block No.1- Stilt Floor + 9 Floors, Block No.2- Stilt Floor + 9 Floors Residential Building with 162 Dwelling Units and Block 3 Ground Floor + 4 Floors Office Building. |
7688.96 |
|
|
|
|
|
|
|
63 |
8131 |
865 |
7/23/2012 |
12/5/2013 |
C3/11705/2012 |
M/S.RUBY BUILDERS AND PROMOTERS REP BY MRS.RUBY MANOHARAN (POA OF S.SASHI KALA AND 4 OTHERS No.240, Velachery Main Road, Selaiyur, Chennai-73. |
Vandalur Padapai Main Road, in S.No.56/2B1A of Varadharajapuram Village, Chennai. |
Varadharajapuram |
Planning Permission for the proposed construction of 2 Blocks Residential developments 298 Dwelling Units and Gym and Swimming Pool at Block No.1 First Floor level Block 1- Stilt Floor + 15 Floors with 238 Dwelling Units Block 2- Stilt Floor + 12 Floors with 60 Dwelling Units. |
9184 |
|
|
|
|
|
|
|
64 |
8132 |
759 |
7/27/2011 |
12/9/2013 |
C3/10826/2011 |
THIRU. R.DAMODARAN AND V.S.SARAVANAN No.17-1, Poes Road, 2nd Street, Teynampet, Chennai-600018. |
S.No.311/3B, 311/3C1, 311/3C2, 311/3C3A, 311/3C3B, 311/3C3C, 312/17B, 312/18A,1A, 312/18A1B, 312/181AC, 312/18A1D, 312/18A1E, 312/18A1F, 312/18A1G, 312/18A1H, 312/18B1 and 312/18B2 of Kottivakkam Village, K.P.Kandan Nagar Road, Chennai. |
Kottivakkam |
Planning Permission for the proposed construction of combined Double Basement Floor combined Stilt Floor + 2 towers each with First Floor to 16 Floor + 17th Floor with 640 Dwelling Units and Service Block Stilt Floor + 1st Floor with swimming pool at First Floor level. |
16663.9 |
|
|
|
|
|
|
|
65 |
8133 |
1122 |
10/5/2012 |
12/16/2013 |
C3/16313/2012 |
M/S.BBCL VAJARA (GPA HOLDER) No.20, Mylai Ranganathan Street, T.Nagar, Chennai-17. |
Old S.No.318/3pt, New S.No. 318/3A1B, 3A1C, 3A1D, 3A1E of Nolambur Village, Chennai. |
Nolambur |
Planning permission for the proposed construction of Double Basement Floor + Ground Floor part + Stilt Floor part + 13 Floor + 14th Floor part Residential cum Commercial Building with 134 Dwelling Units, Retail Shop and super market at first Floor, Gym , multi purpose hall and swimming pool at 14th Floor. |
5566.13 |
|
|
|
|
|
|
|
66 |
8134 |
228 |
3/5/2013 |
12/18/2013 |
C3/4339/2013 |
THE.SUPERITENDING ENGINEER SIDCO THIRU Vi-Ka Industrial Estate, Guindy, Chennai-32. |
T.S.No.2pt, 18pt, Block No.3 of Adyar Village and T.S.No.115pt, 116pt, 118pt and 119pt of Block No.6 of Alandur Village, Chennai. |
Alandur and Adyar |
Revised Planning Permission for the proposed construction of Basement Floor + Ground Floor part/Stilt Floor Part + First Floor to 9th Floor (already approved)and proposed addition of transformer room - Ground Floor only annexed to the main office building at Thiru-vi-ka Industrial Estate, Guindy-10. |
5948.68 |
|
|
|
Multi-storeyed Building comprising Basement Floor + Ground Floor (Part)/Stilt Floor (Part) + 1st Floor to 9th Floor and Transformer Room – Ground Floor only annexed to the Main Office Building |
EC/CCW/N&C/ 9148/2014 |
EC/Central/164/ 2014 dated 25-06-2014 |
|
67 |
8135 |
922 |
8/6/2012 |
12/26/2013 |
C3/12604/2012 |
E.MOHAN C/O.VINOD BUILDERS Z268, 5th Avenue, Anna Nagar, Chennai-40. |
S.No.93/1C and 2B Naravarikuppam Village, Old Door No.164, New Door No.180/1 to 30, GNT Road, Redhills, Chennai-52. |
Naravarikuppam |
Planning Permission for the proposed construction of Double Basement Floor + Stilt Floor + 5 Floors Commercial building with hyper market, fun centre, food coats and 5 thetres |
4283.25 |
|
|
|
|
|
|
|
68 |
8136 |
1264 |
12/14/2011 |
12/26/2013 |
C3/21446/2011 |
M/S.MAHINDRA SATHYAM, SATHYAM COMPUTERS SERVICE LTD, MANASOROVER TOWERS No.271A, Anna Salai, Teynampet, Chennai-18. |
Plot No.12, approved layout, Industrial Township in S.No.602/3pt of Sholinganallur Village, |
Sholinganallur |
Revised planning permission for the regularisation of additional construction in Block 2(Software development 2) Second Floor part + 3rd Floor, Block 5(Food Court 2) First Floor part + Second Floor (IT,ITES) Block 10(Swimming Pool pump room) Ground Floor, Block 12 organic waste converter- Ground Floor, Block 16(Security room) -Ground Floor Block 17(Jacuzzi)- Ground Floor Block 18(Open Air theatre) room, store room and covered pathway, Block 19 Drivers Toilet(Ground Floor) and DG room, covered pathway, covered area swimming pool and smoking zone over the existing development of Block 1(Software development 1) (existing)Ground Floor + 2 Floors, Blcok 2- Software development 2(existing) Ground Floor + 2nd Floor part, Block 3-Software development (existing) Ground Floor + 2 Floors, Block No.4 Food Court 1(existing Ground Floor + FF Block No.5 Food Court 2(existing) Ground Floor + FF , Block 6(existing) Academic Block-GF + 2 Floors Block 7- Housing block(existing) Groud Floor + 3 Floors, Block 8 Service Block 1(existing) Basement Floor + Ground Floor + First Floor Block 9-Service Block 2(existing) Ground Floor Block No.13 Security lounge(existing) Ground Floor Block 14-Security lounge(existing) Ground Floor, Block 15-Security room 1(existing) Ground Floor. |
182107 |
|
|
|
Regularization of additional construction in Block-2 (Software Development -2) - 2nd Floor (Part) + 3rd Floor; Block 5 (Food Court -2) -1st Floor(Part) + 2nd Floor (IT/ITES); Block-10 (Swimming Pool changing Room) – Ground Floor; Block-11 (Swimming Pool Pump Room)- Ground Floor; Block-12 Organic Waste Converter- Ground Floor; Block-16 (Security Room-2) - Ground Floor; Block-17 (Jacuzzi)- Ground Floor; Block-18 (Open Air Theatre Room, Store Room and covered pathway); Block-19 - Driver’s Toilet – Ground Floor, and DG Room, covered pathway, covered Swimming Pool and Smoking Zone over the existing development of Block-1 - Software Development –1 (Existing) Ground Floor + 2 Floors; Block-2 - Software Development -2 (Existing) Ground Floor + 2nd Floor(Part); Block-3:Software Development-3 (Existing) Ground Floor + 2 Floors; Block-4-Food Court-1 (Existing) Ground Floor + 1st Floor; Block-5–Food Court 2 (Existing) Ground Floor + 1st Floor; Block 6- (Existing) Academic Block Ground Floor + 2 Floors; Block 7 - Housing Block (existing) – Ground Floor + 3 Floors; Block 8-Service Block -1 (Existing) Basement Floor + Ground Floor + 1st Floor; Block 9–Service Block 2 (Existing)- Ground Floor; Block 13- Security Lounge (Existing) Ground Floor; Block-14-Security Lounge(Existing) Ground Floor; Block 15- Security Room -1 (Existing) Ground Floor |
EC/S-II/17871/2014 |
EC/South-II/483/2015 dated 13.11.201 |
|
69 |
8137 |
306 |
3/15/2012 |
12/27/2013 |
C3/4575/2012 |
TVL.PADMA MOHNOT AND PANKAJ MOHNOT Old No.35, New No.69, Flat No.8, T.P.Koil Street, Triplicane, Chennai-5. |
S.No.48/13 and 48/22, Block No.10 of Nungambakkam Village, Old Door No.145, New door No.2, Uthamar Gandhi Salai, (Nungambakkam High Road, Chennai-34. |
Nungmabakkam |
Planning Permission for proposed construction of Basement (for two wheeler parking) + Stilt Floor + 10 Floor + 11th Floor part Commercial Building for Office Use) |
1881.04 |
|
|
|
Multi Storied Building consisting Basement floor (TW parking) + Stilt floor +10 floors + 11th floor part Office Use commercial building |
EC/ C-I/10572/2014 |
Completion Certificate No. EC/Central-I/437/ 2015 dated 9.10.2015 |
|
70 |
8138 |
106 |
2/1/2013 |
12/30/2013 |
C3/2208/2013 |
Y.MEERA REDDY MANAGING PARTNER SRI KOWSALYA CONSTRUCTIONS LTD No.4, jayalakshmipuram 1st Street, Nungambakkam, Chennai-34. |
No.A21, and A22 Thiru-vi-Ka Industrial Estate, Guindy - 10, in S.No.46/3. 47/2, 50/5, Block No.6 of Alandur Village, Chennai. |
Alandur |
Planning Permission for the proposed construction of Basement Floor + Ground Floor part/Stilt Floor part + First Floor parking Second to Ninth for Electronic equipment Factory. |
2088.05 |
|
|
|
|
|
|
|
71 |
8139 |
1257 |
11/7/2012 |
12/30/2013 |
C3/15384/2012 |
EXECUTIVE ENGINEER AND ADMINISTRATIVE OFFICER BESANT NAGAR TNHB Chennai-20. |
4th Avenue, and 26th Cross Street, Indira Nagar, Thiruvanmiyur in S.No.54/1pt, 2pt, 3pt, 55/2pt, 3pt, 7pt, T.S.No.10, Block No.16 of Thiruvanmiyur Village. |
Thiruvanmiyur |
Planning Permission for the proposed construction of 3 Blocks Residential development with 204 Dwelling Units - Block 1(LIG) - Stilt Floor + 7 Floors with 56 Dwelling Units, Block 2 - MIG Stilt Floor + 7 Floors with 112 Dwelling Units, Block 3 HIG Stilt + 9 Floors with 36 Dwelling Units. |
11397.2 |
|
|
|
|
|
|
|
72 |
8140 |
667 |
6/15/2012 |
12/31/2013 |
C3/9692/2012 |
M/S.ASSRINFRASTRUCTURE PVT LTD REP BY ITS MD.A.SUNDAR No.6, Padmanabha Nagar 2nd Street, Adyar, Chennai-20. |
Rajiv Gandhi Salai(OMR) in S.No.283/1B2, 2A2, 2B of Okkiyamthooraipakkam Village, Chennai. |
Okkiyamthoraipakkam |
Planning Permission for the proposed construction of Basement Floor (used for Non FSI Area-Lumber room, Electrical room, AHU and DG room) + Stilt Floor + FF + SF (partly used for Office and partly used for Residential) + 3rd to 9th Floor ( use for Residential) Residential cum Commercial (Office) use with 34Dwelling Units. |
1793.85 |
|
|
|
|
|
|
|
73 |
8141 |
999 |
8/27/2012 |
12/31/2013 |
C3/13608/2012 |
Y.PONDURAI No.129, North Usman Road, T.Nagar, Chennai-17. |
Old S.No.31, 32/1, 2, 34/1, 2, 35 and 37pt, of Padi Village, T.S.No.2/2, Block No.12, Ward I of Ambattur Village, Door No.13/4, Chennai- Thiruvallur High Road, Padi, Chennai-50. |
Padi |
Planning permission for the proposed construction of main Block Double Basement + Ground Floor + 9 Floors +10th Floor part Commercial Block with one Dwelling Units at 10th Floor, Service Block Basement Floor + Ground Floor + 2 Floors, MLCP Double Basement Floor + Ground Floor + 4 levels. |
9984.57 |
|
|
|
|
|
|
|
74 |
8142 |
474 |
4/27/2012 |
12/31/2013 |
C3/7562/2012 |
M.K.SUNDARAM, Senthil Towers, A1 1st Avenue, Ashok Nagar, Chennai-83. |
R.S.No.12/10, Block NO.1 of Puliyur Village, Old Door No.22, New Door No.154, Jawarhalal Nehur Road, Chennai. |
Puliyur |
Planning Permission for Proposed construction of Basement Floor part / Stilt Floor part + Ground Floor part + 8 Floors Building with change of use from earlier approve Residential use into Office Use. |
1836.12 |
|
|
|
Basement floor (part)/Stilt floor (part) + Ground floor + 8 floors office use commercial building |
EC/C-1/10048/2014 |
Completion Certificate No. EC/Central/305/2015 dated 14-7-2015 |
|